A new line has an SOP date, and the operators are not hired yet. As a manufacturing staffing agency Godstone Consultech supplies plant manpower on contract — CNC and assembly operators, welders, fitters, electricians, quality inspectors, storekeepers and shift supervisors — trade-tested, on our payroll, with PF, ESI and contract-labour records under the OSH Code held by us and a supervisor of ours on your floor.
Shift pattern, role mix and headcount are enough to start. We reply with a wave plan.
Automotive, EV and battery, electronics and semiconductor, pharmaceutical, FMCG and food processing, textile and apparel. Each sector needs supervisors who have run that floor, because a cleanroom gowning protocol and a press shop do not share a training plan.
Plant manpower gaps are rarely a wage problem. They are a sourcing-speed and retention problem that shows up in output.
Forty operators are needed in three weeks. The local pool within travel distance is thin, ITI campuses have already been picked over, and untested hands cannot be put on a torque-critical station.
Overtime covers the gap until quality slips. Rejections rise, a customer audit finds an untrained operator on a critical station, and the plant pays twice — in rework and in the next quarter's allocation.
Operators hired in waves against your SOP date, each wave gated on a trade test, with attrition tracked monthly by reason code.
Plan a ramp with us →Shares are illustrative planning ratios for a 100-head deployment across two shifts, not data from client contracts. Use it as a sanity check on your own plan before the requisition goes out.
This page covers plant staffing in general. Each sector below has its own regulatory, skill and shift profile, and its own page with the roles, clusters and screening we use there.
A new line is staffed in waves, not in one lot. Each wave is gated on a trade test and an induction record, so the first shift on a critical station is never an untested hand.
We take your station list, takt and shift pattern and return a wave plan: how many heads per wave, which skills gate which station, and the bill rate per role.
Local sourcing within commuting distance of the gate first, then ITI and polytechnic pools, then migrant pools, with accommodation and transport planned where the belt needs it. Skilled roles sit a practical test.
KYC, age proof, prior-employment and address checks, bank and UAN linkage, ESI registration, then safety induction and PPE issue before the first shift.
We aim for seven working days from signed requisition for semi-skilled operators. Trade-tested roles such as CNC setters or pipe welders add three to five days per wave.
We plan four to six weeks to full strength for a ramp of about 300 heads, with a reliever pool built in parallel so week-one absenteeism does not break the line.
Fill rate, attrition with reason codes, rejection trend and statutory challans reviewed with plant HR; any exit is replaced within the contracted window.
Most plants run a blend. The Labour Codes now define where each model fits, and using the wrong one on the wrong station is the most common compliance gap in plant audits.
| Contract staffing (via Godstone) | Fixed-term employment | Apprentices (NAPS) | Permanent | |
|---|---|---|---|---|
| Who employs | Godstone, as contractor; you are the principal employer | You, for a fixed period | You, under the Apprentices Act 1961 | You |
| Best fit | Volume swings, new-line ramps, non-core and support work | Project or model-cycle roles you want on your own rolls | Entry-level trades you want to train and absorb | Core, long-tenure and critical-skill roles |
| Legal frame | OSH Code 2020 (its contract-labour chapter replaced CLRA 1970) | Industrial Relations Code 2020 | Apprentices Act 1961; engagement band of 2.5–15% of workforce for establishments with 30+ workers | All four Labour Codes |
| Watch-outs | Contract labour in core activities is restricted, with three statutory exceptions (see FAQ) | Same wages and benefits as permanent staff doing the same work; gratuity after one year | Training plan and stipend obligations; not a substitute for production headcount | Fixed cost through downturns |
| Payroll and compliance | Ours: wages, PF, ESI, bonus, registers, returns | Yours | Yours (NAPS portal) | Yours |
Summary only. State rules under the Labour Codes are still being notified in several States; where they are pending, earlier State rules continue to the extent they are not inconsistent with the Codes.
The four Labour Codes replaced 29 central labour laws, including the Factories Act 1948 and the Contract Labour (Regulation and Abolition) Act 1970. For a plant using contract manpower, these are the points that matter day to day.
A premises is a factory under the OSH Code at 20 or more workers where power is used, or 40 or more without power, up from 10 and 20 under the Factories Act.
The working day is 8 hours and the week 48 hours; overtime is paid at twice the ordinary rate of wages, within State-notified limits.
A contractor with 50 or more contract workers needs a single licence under the OSH Code, valid for five years. Below 50, the contract-labour chapter does not apply.
If a contractor fails to pay wages, the principal employer must pay and recover the amount from the contractor. Welfare facilities on your premises remain your duty.
Women may work before 6 am and after 7 pm with their written consent and the prescribed safeguards: transport, lighting, CCTV and washrooms.
Every worker, contract workers included, gets an appointment letter. We issue ours at joining and keep the acknowledgement on file for your audit.
The most common reason a plant is short on the floor is that headcount was planned per post, not per post-hour. With a 48-hour week, this is the arithmetic we run before quoting.
| Coverage pattern | Post-hours per week | Heads at 48 h/week | With a 10–15% reliever reserve |
|---|---|---|---|
| General shift, 6 days | 48 | 1.0 | about 1.1–1.15 per post |
| Two shifts, 6 days | 96 | 2.0 | about 2.2–2.3 per post |
| Three shifts, 6 days | 144 | 3.0 | about 3.3–3.5 per post |
| Three shifts, 7 days (continuous) | 168 | 3.5 | about 3.9–4.0 per post |
The reliever reserve covers weekly-off gaps, earned leave, festival holidays and absenteeism; we size it from your last six months of attendance rather than a fixed rule. Overtime can bridge short gaps but is capped by State rules and paid at double rate.
Principal-employer liability under the Labour Codes means a weak contractor becomes your problem. Ask for evidence on each of these before the first wave.
What plant HR and operations ask us before the first wave is signed off.
Send your plant requirement →It supplies plant headcount on contract: machine and assembly operators, skilled trades, quality inspectors, storekeepers and shift supervisors. Godstone sources and trade-tests the workers, employs them on its own payroll, handles PF, ESI and contractor compliance under the OSH Code (the regime that replaced CLRA in November 2025), and keeps a site supervisor on the shop floor.
We aim for wave one of operators to report within seven working days of a signed requisition, and full strength in four to six weeks for a 300-plus ramp. Roles needing a trade test — 6G welders, CNC setters — add three to five days per wave.
Both. The bench covers CNC and VMC operators, injection moulding and power press operators, assembly line operators, electricians, fitters, welders, HVAC technicians, quality inspectors, storekeepers, forklift operators, production supervisors and maintenance engineers — up to plant head through executive search.
The replacement window is written into the contract (our target is 15 days), and attrition is reported per site monthly with coded reasons. What holds blue-collar attrition down is local sourcing within travel distance of the gate, wages paid by the 7th, and accommodation or transport support where the belt needs it.
Automotive and tier-1, EV and battery, electronics and semiconductor assembly, pharmaceutical, FMCG and food processing, textile and apparel, and general engineering. We are based in Chennai and deploy across India, including the Sriperumbudur, Oragadam, Hosur, Bangalore, Pune, Chakan, Sanand and Pithampur belts.
The OSH Code restricts contract labour in core activities, but allows it where the activity is ordinarily done through contractors in that type of establishment, where it does not need full-time workers for most of the working day, or where a sudden increase in volume must be completed in a set time. New-line ramps and seasonal peaks usually fit the third exception; long-term core stations usually belong on your rolls or on fixed-term contracts. We flag stations that need a legal view before deployment.
Under the OSH Code the principal employer must pay unpaid wages and recover them from the contractor, and unpaid social security contributions can also be pursued against the principal employer. That is why we share monthly wage-transfer proof and PF and ESI challans reconciled to your gate headcount.
Yes. Under the OSH Code women can work before 6 am and after 7 pm with their written consent, provided the employer arranges safe transport, lighting, CCTV, washrooms and the other safeguards in the applicable rules. We collect the consent forms and plan pick-up and drop routes with you.
A continuous three-shift post needs 168 post-hours a week; at 48 hours per worker that is 3.5 heads before leave and absenteeism. With a reliever reserve most plants land at about four heads per continuous post.
Give us the SOP date and the role mix. We aim to send a wave plan, a trade-test schedule and a bill rate per role within one working day.